|
|
Mill Pond IV
Construction projects in the 20th Century have disrupted the symmetry
of the original Bulfinch Triangle. The Orange and Green Lines now run
through the center of the triangle, and the construction of the Central
Artery in the 1950s cut through the right-hand side.
![]() |